Warehouse Fiber Network Relocation & Upgrade









Description
Client: Infinity Bulk Logistics Sdn Bhd (via Switch Two Com Sdn Bhd)
Location: Pulau Indah, Westport
Date: 15 April 2025 - 21 April 2025

Summary
This project involved the relocation and enhancement of the fiber network infrastructure within the client’s warehouse and server room facilities. Work included:
- Relocating an existing OM3 outdoor fiber cable
- Pulling two new 12-core outdoor fiber runs
- Splicing fiber connections
- Rewiring CCTV network cables
- The upgrade aimed to ensure stable, high-speed connectivity throughout multiple operational zones.

Highlights
All fiber splices successfully completed and tested for performance
New cabling installed with verified link integrity
Minimal operational disruption despite work across multiple zones

STPlus Product Integration
Our fiber and connectivity products played a central role in this project:
1. STPlus 12-Core Outdoor Fiber Cable
Provided robust, high-capacity fiber links suitable for industrial environments.
2. STPlus SC OM3 Fiber Optic Patch Cord
Delivered high-speed multimode connectivity for the upgraded backbone.
3. STPlus SC Singlemode Pigtail
Ensured precise terminations and low-loss connections.
4. STPlus S2 Splicing Machine
Used for efficient and accurate fiber splicing across all runs.
5. Third-Party Systems Used
Draka Cat6 Network Cable – Used for rewiring CCTV and internal networking

Why STPlus?
This project demonstrates the versatility and reliability of STPlus fiber solutions in fast-paced, logistics-heavy environments. With accurate splicing and high-performance components, our products helped deliver a robust network infrastructure that supports current needs and future scalability.